FIL8100-B6-250 AIRBUS A330/A340 REMOVAL INSTALLATION MLG/CLG TROLLEY

FIL8100-B6-250 AIRBUS A330/A340 REMOVAL INSTALLATION MLG/CLG TROLLEY

DESIGNED, DEVELOPED AND MANUFACTURED BY FIELD FOR THE REMOVAL AND INSTALLATION OF THE MAIN AND CENTRE LANDING GEARS ON THE A330-200, A330-300, A330-200F, ACJ330 AND A330 MRTT, A330-800 NEO, A330-900 NEO, A340-200, A340-300, A330-600, A340-600 AIRCRAFT DURING MAINTENANCE.

THIS IS THE ONLY AIRBUS APPROVED EQUIPMENT TO PERFORM THE TASK AND APPEARS IN THE AIRBUS AIRCRAFT MAINTENANCE MANUAL (AMM).

THE FIL8100-B6-250 OFFERS SIX AXES; FIVE OF THE AXES ARE MANUALLY OPERATED VIA HAND-WHEELS. THE FINAL Z AXIS (RAISE & LOWER) IS POWERED ELECTRICALLY.

© 2022 FIELD INTERNATIONAL

Part Information

Part Number
FIL8100-B6-250
Aircraft Manufacturer
AIRBUS A330, AIRBUS A340
Weight
5980 kg
Dimensions (cm)
407 × 257 × 227 cm
Aircraft Models
AIRBUS A330, AIRBUS A340

Similar Products

Trusted by

Request a Callback

If you have a question please leave your details below and a member of the team will be able to get back to you.

GDPR*
© 2026 Field International Group Limited